Footings for Major Structural Upgrade
This commercial project involved a building that used to be a high school now being converted to an apartment building. These are the footings for the sheer walls, which are shields from wind and facility active load acting as braces for the outer brick walls. Pictured below is the digging, shoring and reinforcement before the concrete was poured.